The Washington Department of Transportation will conduct Avalanche control work on Thursday morning.

WSDOT will begin avalanche control measures on US 2 Stevens Pass at 9 AM.

Eastbound traffic will be stopped at Scenic (MP 58) and westbound traffic will be stopped at the summit of Stevens Pass (MP 64)

1340 The Hawk logo
Get our free mobile app

Avalanche control work generally takes from 30 minutes to 2 hours to complete. WSDOT will provide an update should an extended closure become necessary.

[PHOTOS] 13 Washington DOT Pics of Bomb Cyclone Destruction

The Washington State Department of Transportation clean-up after bomb cyclone hits Washington State.

Gallery Credit: Rik Mikals

20 Red-Flag Travel Warnings for Americans

Gallery Credit: Reesha Cosby